DEXTER A. HANSEN
2512 Outlook Ridge Loop
Leander, TX 78641
phone: 512-578-8861
Home Page: http://www.flowhelp.com/dhansen/
EXPERTISE
Meeting objectives without adding resources
in a high growth
environment. Direct project, quality assurance, document control,
and information
technology departmental activities, coordinate all required
engineering
disciplines and resources required to verify & validate
product design,
develop and document specifications. Ensure manufactured products
comply
with customer and other requirements such as Mil-Std 883, AS9101,
ISO14001,
ISO 13485, CE/UL/CSA & VDE compliance/certification and
product reliability.
Hands-on with ISO 9001 implementation / compliance / training,
FMEA's, Total
Quality Management (TQM), SOX-404, corrective/preventive action
system,
sub-contractor/supplier monitoring/rating, 5-why's, 8D's, ERP
Systems, PHP/MySQL,
VMWare, semiconductor fabrication, mechanical and electronics
assembly. Provide
user and computer network hardware / software support / training
in a 200+
computer, multi-platform (Linux & Microsoft) environment.
In all of my assignments I am self starting and demonstrate
independent work
habits; including regular cooperation with company departments to
accomplish
overall company goals and objectives.
EDUCATION
- M.B.A., Mankato State University, Mankato, Minnesota.
- B.S. Industrial Technology -- concentrations in Electronics
and Manufacturing Engineering from U.W.--Stout, Menomonie,
Wisconsin.
PROFESSIONAL EXPERIENCE
SCHUNK XYCARB TECHNOLOGY, INC. (SXT), Georgetown, TX
SEP 2017 -- OCT 2023
Quality Assurance / Continuous Improvement Engineer
SEP 2017 -- OCT 2020
Quality Assurance
Engineer / Inspector (Contract) FEB 2021 - OCT 2023
- Provided quality assurance, quality system and continuous
process improvements addressing products and processes
consistent with customer and company needs. The customer base
includes semiconductor manufactures/users of Opaque & Clear
Fuzed Quartz and Ceramic components used semiconductor
processing.
- Activities included writing processes, maintaining ISO 9001
certification to include working with all employees, as well as,
auditing for corrective/preventive actions and quality system
compliance.
- Provided support for inspection personnel using Coordinate
Measurement Systems (CMMs), caliphers, micrometers, gauge pins,
gauge blocks, profilometers, etc..
- Provided incoming inspections / created / provided First
Articles Inspection Reports, Critical Dimension Reports (CDRs)
and Certificates of Conformance (CoCs).for customers, other
operating divisions and sales offices.
NVE CORPORATION, Eden Prairie, MN May 1996 - JAN 2017
Quality Manager/ISO Management Representative/Auditor (Lead
ISO Auditor
and SOX-404 Internal Controls Auditor), Trainer &
Document
Control/Information & Computer Systems Manager
- Meeting objectives while supporting new product activities,
an increasing customer base and the quantity of product
shipments increasing by 30+% per year over last 5 years without
adding resources.
- Directly responsible for all quality activities in a TQM
environment to include implementation / maintaining ISO 9001
certification to include working with and training all
departments at all levels for a magnetic based sensors,
isolators and memory products.. The customer base includes
industrial, military, consumer and medical markets to include
parts used in implantable pacemakers & defibulators and
hearing aids.
- Direct and control quality assurance, quality system and
continuous process improvements addressing products and
processes consistent with customer and company needs. The
customer base includes industrial, military (NDT/Fuze &
anti-tamper applications), consumer and medical markets to
include parts used in implantable pacemakers and hearing aids.
- Coordinating activities related to improving the quality of
products and compliance with customer requirements, regulations.
Monitor and analyze customer feedback, Corrective/Preventive
Action systems, and product qualification, verification &
validation for functional units.
- Direct internal audits as Lead Auditor, represents management
for ISO registration to ensure there is no lapse in quality
system effectiveness and collaborates with personnel at all
levels, across functional groups and geographic locations,
including executive management, to improve business processes.
- Ensures quality requirements and standards are incorporated
into project plans, schedules and budgets; ensures processes are
established to test and/or evaluate products and processes for
compliance with applicable agencies and regulations
- Set-up, documented and maintain all management systems within
the company to meet ISO 9001 Quality System requirements to
include design, sales, marketing, operations and quality
- Providing management support for technical research and
development programs/projects in the areas of process
development and electronic systems.
- Directed Enterprise Resource Planning (ERP) implementation
- Implemented Enterprise IT Infrastructure
Monitoring/documented IT procedures
- Responsible for document control, computer network (Linux
(Centos/Debian/Redhat)), information systems (MS Server 20000
& 2003 / Win 3.1/95/98/2K/XP/Vista/Win 7), applications
support (Office 2000/2003/2007/2010) and hardware support,
company email/website/online web store (webmaster)
- Pioneer in applying risk mitigation based on quality
management systems and the Sarbanes-Oxley Act. Integrated
requirements for Sarbanes-Oxley (SOX) Act into NVE's ISO9001
Quality Management System within the company, setup Internal
Controls function and audited accounting and financial
procedures and information system processes to meet public
corporation corporate governance requirements.
BEST POWER TECHNOLOGY, INC., Necedah, WI 1989 - May 1996
Product Manager, UBS and ISO 9000 Program Coordinator/Lead
Auditor/Trainer,
1993 to 1996
- Implemented / responsible for achieving ISO 9001
certification & registration activities; involved in working
with and training all departments at all levels (Employee of the
Year - 1994 - 806 employee company)
- Set-up and documented all management systems within the
company to meet ISO 9001 Quality System requirements to include
design, sales, marketing, operations and quality
- Directly responsible for successful the start-up of Best's
Uninterruptible Battery Systems (UPS) Division's gen-set product
introduction, product design/engineering support, product
costing, product processing/support, applications engineering,
marketing support, product assembly, technical publications, and
product documentation to include all aspects of UBS
gasoline/gaseous/diesel fuel driven generator product
Installation Manual, User Manuals and Service Manuals
- Directed technical program management, manufacturing
engineering; mechanical engineering, new product development,
and pre-production/manufacturing start up activity for new
generator Division
- Initially started department and hired staff for
Manufacturing Engineering Department for Best Power's
Uninterruptible Power Systems (UPS) Division as no formal
production engineering activity existed within company;
Supervised 13 people
- LAN Administrator for UBS Division. Setup/loaded initial data
into Baan ERP implementation
Manager - Advanced Manufacturing Services and Chief
Mechanical Engineer
-- 1991/3
- Directed technical program management, manufacturing
engineering, mechanical engineering, new product development,
and pre-production/manufacturing start up activity for new
Division
- Directly responsible for product costing, product
processing/support, technical publications, and product
documentation to include all aspects of UBS
gasoline/gaseous/diesel fuel driven generator product
Installation Manual, User Manuals and Service Manuals
Manager, Manufacturing Engineering, 1989 -- 1990 -- Manager,
Mechanical
Engineering 1990 -- 1991
- Initially started department and hired staff for
Manufacturing Engineering Department as no formal production
engineering activity existed within company
- Developed initial product costs and time standards for new
products and maintained standards
- Developed and implemented management and documentation system
used throughout the company for handling initial product
introduction for custom and small quantity orders
- Decreased throughput time for Drafting Department by 30%
through equipment & software upgrades and implementing use
of data libraries & standardization
IMPRIMIS TECHNOLOGY (formerly MPI/CDC, now Seagate
Technology),
Bloomington, MN 1979 -- 1989
Senior Manufacturing Engineer/Capital Equipment
Coordinator/Administrator,
1986 -- 1989
- Directed project activity at a product level for cutting edge
disk drive products, new product development, capital equipment
justification, tooling & equipment, product costing, time
standards and manufacturing start up activities (Responsible for
tooling & capital expenditures from $50,000 to $4,000,000
per project); supervised 19 people
- Technical Excellence Award (One of five for a 50,000+
employee company)
- System Administrator, CDC mini-mainframe running CDC ICEM
CAD/CAM on a Xenix operating system. Setup system and had
operational within 3 days without vendor support
Manager, Advanced Manufacturing Services, 1984 -- 1985
- Responsible for new disk drive product start-up, continuation
support activities, factory automation, and computer services
(Department yearly budget of $580,000 and $750,000/year in
capital)
- Improved disk drive module yield from 50% to 85% within first
five months by implementing total quality management techniques,
operator training & certification program, Statistical
Process Control/Statistical Quality Control, and Just-In-Time
production concepts
- Supervised a staff of thirtenn system administrators,
engineers, programmers, and technicians
Pre-Production Manufacturing Engineer, 1980 -- 1984
- Performed as Statistical Process Control/ Statistical Quality
Control Consultant and was Manager, Pre-production Tool Design
for last 18 months for Small Disk Division
- Directed project activity at a product level; involved from
initial design to full production
- Directly responsible for annual project tooling expenditures
averaging $130,000 and capital expenditures of $90,000 per year
- Received Corporations' and Divisions' highest recognition,
their Technical Excellence Awards for new product development,
tool design, product start up/build and implementation efforts
in 1982
- Installed a Class 100 clean room, implemented CAD/CAM, setup
and supervised an automation applications lab.
- Supervised a tool engineer, automation engineer, drafts
person, and configuration technician
Pre-Production Manufacturing Engineer, 1979 -- 1980
- Supervising all activity for the Pre-Production Department
for Redwood Falls MN facility
- Developed standardized method for quoting and managing
incoming projects to include project funding, internal work
requests, and product transfers from other facilities
- Products worked on included CDC/MPI and OEM power supplies,
cables, wire harnesses, toroids, transformers, transducers, and
various electronic assemblies used in controllers and disk
drives
- Set up and implemented CAD system for department.
Systems Manager for small mainframe utilizing Xenix (AOS)
Operating System (Mainframe operating system by Novell Netware)
LAKE CENTER INDUSTRIES, INC., Winona, MN 1977 -- 1979
Electronics Manufacturing Engineer
- Initial responsibilities included quoting assembly labor,
line balancing, writing and maintaining manufacturing
instructions, preparing samples, establishing test procedures,
determined methods, and initiated and implemented changes that
would result in efficient production
- Products worked on include automotive switches, control
panels, wire harnesses, and numerous printed circuit board
assemblies to include smoke detectors, intrusion alarms, and
electronic motor speed detectors, all in a high volume
environment
SANNA DIVISION, BEATRICE FOODS CO., Menomonie, WI 1969 --
1971 and
1973 -- 1977
Special Products Blending Operator/Lead Operator
- Completed College degree in 4 years while working 60+ hours
per week.
U.S. ARMY 1971 -- 1973
31M20-Radio, Relay and Carrier Attendant (Electronics
Technician)
- Completed 16 Week Advanced Signal MOS Course in 13 weeks
OTHER
- Citizenship U.S.A., Veteran, current/active DoD Secret
security clearance, Member-ASQ